Know-how · Installation

FD 440 – Installation, first run & vacuum test

Step by step: connect the pump and chamber, switch on the power and run the first cooling and vacuum test. Choose your pump and language – video and guide follow your choice.

Pump

Language

Installation

What’s in the box, six assembly steps, then the first check: wait 20 minutes, switch on cooling, test the vacuum.

The first run

From preparation to defrosting: cut and freeze the product correctly, pre-cool the machine, load it, build the vacuum, load the recipe, dry, unload and defrost.

Vacuum test of the pump

All connections checked and still no vacuum? This test shows whether the pump itself reaches enough vacuum: sensor directly on the pump, target 30 mTorr or less.

All guides

The PDF guides for both pumps in every language.

FD 440 · Oil pump

Deutsch · PDF

FD 440 · Oil pump

English · PDF

FD 440 · Oil pump

Français · PDF

FD 440 · Oil pump

Español · PDF

FD 440 · Scroll pump

Deutsch · PDF

FD 440 · Scroll pump

English · PDF

FD 440 · Scroll pump

Français · PDF

FD 440 · Scroll pump

Español · PDF

Questions about the installation? Contact us

W

مستشار WAVE

أسئلة واستشارات · ذكاء اصطناعي

مرحبًا! أجيب عن الأسئلة حول التجفيف بالتجميد وأساعدك في اختيار جهاز WAVE مناسب. كيف يمكنني مساعدتك؟

مستشار بالذكاء الاصطناعي · الأسعار تقديرية؛ يصدر العرض الملزم من فريق WAVE.